{
  "schemaVersion": 1,
  "slug": "decision-presentation",
  "id": "case-decision-presentation",
  "title": "A decision deck that keeps the evidence attached",
  "summary": "Turn a fictional offline inspection decision into an eight-slide editable PowerPoint with source-bound metrics, charts, a workflow, stop rules, and actual PPTX page previews.",
  "category": "deliverables",
  "features": [
    "Presentations",
    "Editable PPTX",
    "Slide previews",
    "Decision handoff",
    "Result provenance",
    "Charts",
    "Architecture diagrams"
  ],
  "image": {
    "file": "slide-montage.png",
    "alt": "Eight-slide Northline Service decision deck with a dark pilot decision cover, assumed baseline and savings charts, an offline workflow with conflict hold, stop-rule table, timeline and expansion gates."
  },
  "steps": [
    {
      "title": "Start with a bounded decision",
      "body": "A fictional 12-technician service region is considering offline inspection capture. The deck asks for one four-week pilot, with no automatic expansion."
    },
    {
      "title": "Pin every numeric input",
      "body": "The assumed 8.4 team hours per week, fictional six-person prompts and calculated 4.29-hour savings scenario come from the downloadable investigation. The build checks source pointers and arithmetic before generating slides."
    },
    {
      "title": "Export native PowerPoint objects",
      "body": "The platform's trusted template and native PPTX projector create editable text, metrics, bars, a risk table, a timeline, shapes and attached workflow connectors, plus a PDF and portable source bundle."
    },
    {
      "title": "Inspect the real pages",
      "body": "The guarded isolated renderer captures all eight PPTX pages and checks browser, PDF and native views. The montage below comes from the rendered PowerPoint pages."
    }
  ],
  "outcome": {
    "title": "A pilot decision ready for human review",
    "body": "The recommendation, fictional assumptions, proposed workflow, stop rules and three expansion gates live in an eight-slide editable deck. The renderer validated the deliverable; real pilot results remain unmeasured."
  },
  "provenance": "Northline Service, interview prompts, times and targets are synthetic example inputs. The downloadable investigation and typed deck identify assumptions and proposed gates. The PPTX, PDF, actual PowerPoint page captures and 48-view receipt were generated locally through the guarded platform renderer. Its reviewState remains pending-independent-vision; this is neither a commissioned SH21 approval nor a measured customer result.",
  "metrics": [
    {"value": "8", "label": "editable slides"},
    {"value": "48/48", "label": "renderer views passed"},
    {"value": "4", "label": "native connectors"}
  ],
  "downloads": [
    {"file": "northline-offline-pilot.pptx", "label": "Editable PowerPoint"},
    {"file": "northline-offline-pilot.pdf", "label": "Presentation PDF"},
    {"file": "platform-source.zip", "label": "Portable presentation source"},
    {"file": "investigation.json", "label": "Fictional investigation"},
    {"file": "deck-input.json", "label": "Typed deck input"},
    {"file": "validation-receipt.json", "label": "Validation summary"},
    {"file": "qualified-render-receipt.json", "label": "Full renderer receipt"}
  ],
  "documents": [
    {
      "file": "README.md",
      "title": "How the decision deck was made",
      "label": "Read the walkthrough",
      "description": "The story, source arithmetic, native export path, validation scope and reproducibility steps."
    }
  ],
  "previews": [
    {
      "file": "preview/slide-04.png",
      "title": "Offline workflow",
      "alt": "Actual PowerPoint render of the proposed Capture to Local queue to Reconcile to Reviewed record workflow, with an explicit Conflict hold branch."
    },
    {
      "file": "preview/slide-05.png",
      "title": "Savings scenario",
      "alt": "Actual PowerPoint render with the calculated 4.29 team-hour weekly savings scenario and bars comparing an assumed 8.4-hour baseline with 4.11 hours remaining."
    }
  ]
}
